[1]
Dong, F. , Gong, Q. , Wang, H. , Yi, S. and Cai, Y. 2019. Rest Breaks Arrange Based on Empirical Studies of Productivity in Manufacturing Industry. Asian Economic and Financial Review . 9, 9 (Sep. 2019), 1043–1066. DOI:https://doi.org/10.18488/journal.aefr.2019.99.1043.1066.